Early access is open for pharmaceutical plants.Book a walkthrough
NewEarly access for GMP plants

Every batch. Every signature. One record.

The pharmaceutical manufacturing ERP with quality built in. Planning to dispatch and the laboratory to finance in one system, with your GMP rules enforced as people work, not found missing in the audit.

  • 21 CFR Part 11 controls
  • Schedule M records
  • English and हिन्दी
app.pharmaeta.com/dashboard
Quality assurance dashboard in Pharma-ETA: open change controls, deviations, CAPA, OOS, my tasks and quality alerts
BMR-260002 · v3 Paracetamol Tablets IP 500 mg
Released
  1. DispensingBalance BAL-03 · R. Patil09:14
  2. Compression20 of 20 within limits15:05
  3. Line clearanceSecond check · S. Khan16:20
  4. Assay 99.2%95.0–105.0% · judged by systemPass
Electronic signature

Meera Iyer, Head of QA · Approved for release · 18 Nov 2026, 23:11 IST

RefusedA. Desai prepared this certificate of analysis, so cannot approve it. Another approver must sign.

Built around
  • 21 CFR Part 11
  • EU GMP Annex 11
  • Schedule M (revised)
  • ICH Q9 and Q10
  • ALCOA+
  • GAMP 5

How it works

One system, from the first vendor to the released batch

Four of the workflows Pharma-ETA runs, on the real screens, with demonstration data.

Vendor qualification

From a new vendor to the Approved Vendor List, step by step

Purchase registers the vendor with a provisional ID and requests documents and samples in one email. QA verifies, QC tests three batches, the audit is signed off by a second person, and only then does the vendor reach the AVL.

  • Each step done and signed by the role that owns it
  • The AVL by material and vendor, with every approval’s history
  • Vendor performance and quality agreements alongside
Procurement and vendor qualification
app.pharmaeta.com/purchase/vendor-qualifications
Vendor qualification list in Pharma-ETA showing each vendor’s current step

ApprovedApproved vendor ID issued after the audit was signed off by a second person.

Batch manufacturing

The batch record, written while the batch is made

Batches are issued from the approved master record. Weights come from the balance, line clearance needs a second person, and in-process checks are judged against their limits. QA releases with a signature, with the results and open events in front of them.

  • Master batch records approved by version
  • Weights captured from connected balances
  • Every batch tracked from issue to release
Batch manufacturing (eBMR)
app.pharmaeta.com/planning/batch-tracker
Batch tracker in Pharma-ETA showing each batch from issue to release

ReleasedQA release is a signed act that records its meaning and its reason.

QC laboratory

Results judged by the specification, not by hand

Tests are generated from the released specification, and every result is judged pass or fail by the system. An out-of-specification result opens its own investigation, and no certificate of analysis is issued while one is open.

  • Instrument readings kept whole and hashed
  • Results refused from instruments out of calibration
  • Stability studies with excursions and mean kinetic temperature
QC laboratory (LIMS)
app.pharmaeta.com/quality/samples
QC sample register in Pharma-ETA listing samples by material, batch, stage and status

RefusedCertificate of analysis: an investigation on this batch is still open.

Data integrity

Who, what, when and why, for every change

The audit trail is always on and hash-chained, so a change cannot hide. Every signature records its meaning and reason, needs a password and a personal signing PIN, and is locked to the version of the record it signs.

  • Corrections supersede; the original stays readable
  • Nobody approves their own work
  • Training checked before every GMP act
Quality management (QMS)
app.pharmaeta.com/quality/audit-trail
Audit trail in Pharma-ETA listing who changed what, when, and the reason

Electronic signatureMeaning, reason, password and signing PIN, bound to version 3 of the record.

Rules, not reminders

It says no, so your auditor doesn’t have to

Most systems record what happened. Pharma-ETA also refuses what should not happen, at the moment someone tries it, and says why in plain words.

Hundreds of rules like these are enforced in the database itself, so no screen, import or integration can go around them.

See the rules in every module

  • QC laboratory · refused

    An analyst approving a certificate of analysis they prepared.

    Four-eyes is checked when the signature is attempted.
  • Training · refused

    Someone untrained drawing a sample, entering a result or clearing a line.

    Training grants the qualification; the qualification opens the step.
  • QC laboratory · refused

    Invalidating an out-of-specification result without a verified root cause.

    “Analyst error” needs evidence, not a sentence.
  • Quality management · refused

    Closing a CAPA while one of its actions is still open.

  • Warehouse · refused

    Dispatching a lot with less shelf life than that customer or country requires.

15modules, from planning to finance
290+screens, each with its own help
1database per company, never shared
2languages on every screen: English and Hindi

The platform

15 modules, one database, no interfaces between them

Quality, production, the warehouse and finance read and write the same records. A deviation is raised against the real batch, a certificate of analysis is built from the results the laboratory recorded, and a dispatch knows the shelf life of every lot.

Why one system

Compared with the usual way of running a plant

Most plants run a general ERP for stock and money, and a separate QMS or LIMS for quality, with spreadsheets and paper in between.

How Pharma-ETA compares with a typical ERP and with an ERP plus a separate QMS or LIMS
Capability Typical ERP ERP + separate QMS/LIMS Pharma-ETA
Batch, stock and quality status in one place Partly: quality status added on No: copied between systems Yes: the same record
Electronic signature with meaning, reason and record version Often an add-on In the QMS only On every signed act
Audit trail that cannot be switched off Usually configurable In the QMS only Always on, tamper-evident
Four-eyes and training checked at the moment of the act Rarely Inside each system Across every module
QC result linked to batch release Manual hand-off Needs an interface Same record
Each company in its own database Varies Varies Yes
GST, e-invoice, e-way bill and TDS Usually Not covered Built in
Hindi on the shop floor Rarely Rarely Yes

Based on what each kind of product typically offers, not on any one vendor. Ask us to show any row on your own process.

Compliance

Built around the rules your auditors cite

Software cannot make a plant compliant. It can make the compliant way the easy way, and keep records that answer an inspector’s questions.

21 CFR Part 11

Electronic records and signatures

Each signature shows the signer’s name, the date and time and its meaning, needs a password and a signing PIN, and is locked to the version of the record it signs.

EU GMP Annex 11

Computerised systems

Every change is in the audit trail with its reason. Access is by role, and records stay readable for their retention period.

Schedule M (revised)

Indian GMP

Quality system, risk management, product quality review, supplier qualification, stability and change control kept as connected records.

ALCOA+

Data integrity

Entries are attributable to a person, recorded when they happen, and corrected without erasing the original.

ICH Q9 and Q10

Risk and the quality system

Risks re-scored rather than waved through; CAPA, change control and management review connected to the events behind them.

GAMP 5

Risk-based validation

A description of each control and how it behaves, to support your computerised system validation.

Pharma-ETA is designed to support these requirements. Compliance depends on how each company validates, configures and uses a system, and remains the manufacturer’s responsibility.

How each control works

For the people who use it

Your shop floor reads Hindi. So does Pharma-ETA.

Every screen is available in English and Hindi, and each person chooses their own. Gujarati and Marathi translations are in progress.

अनुमोदित विक्रेता सूचीApproved vendor list
मेरे हस्ताक्षर की प्रतीक्षाAwaiting my signature
परिवर्तन नियंत्रणChange control
स्थिरता अध्ययनStability studies

Day one

Nobody is left guessing what to do next

  • My tasks. Each person sees what is waiting for them, what they are waiting on, and what to set up first, such as their signing PIN.
  • Urgent items stand out. Overdue training or an expired password is highlighted on every screen until it is dealt with.
  • Help inside every screen. A guide and how-to answers for the page you are on.
  • Approvals in one place. Everything waiting for your signature, the late ones first.

Early access

How a plant starts

We are opening Pharma-ETA to a small group of plants, and onboarding each one with the team that builds it. If it is not the right fit for your plant yet, we will tell you.

  1. Walkthrough

    Thirty minutes on your own process. No slides.

  2. Plan

    Choose the modules to start with and agree what success looks like.

  3. Set up

    Company, plants, roles and numbering configured; master data imported.

  4. Train

    Your team trained in the system’s own training module, so qualifications are on record from day one.

  5. Go live

    Module by module, with a direct line to the people building it.

What early access includes

Questions

What buyers ask first

What is Pharma-ETA?

An ERP built for pharmaceutical manufacturers. Quality management, the QC laboratory, batch records, the warehouse, planning, purchase, sales and finance are one system, with GMP rules such as four-eyes approval, training gates and electronic signatures enforced by the system itself.

Who is it for?

Pharmaceutical manufacturers in India: formulation plants (tablets, capsules, liquids, semi-solids), sterile and injectable plants, API and intermediate manufacturers, and contract and loan-licence manufacturers. It is designed for small and mid-size companies that want one system rather than an ERP plus a separate QMS and LIMS.

Is Pharma-ETA compliant with 21 CFR Part 11 and EU GMP Annex 11?

No software is compliant on its own: compliance comes from how a regulated company validates and uses a system. Pharma-ETA provides the technical controls those regulations ask for: unique user accounts, electronic signatures that show the signer’s name, the date and time and the meaning, permanently linked to the record; an audit trail that cannot be switched off; a reason for every change; role-based access; and approval by a second person. We give you the information about these controls that your computerised system validation needs.

Does it help with the revised Schedule M?

Revised Schedule M brings Indian GMP closer to WHO and PIC/S expectations, including a pharmaceutical quality system, quality risk management, product quality review, supplier qualification and validated computerised systems. Pharma-ETA keeps the records each of these needs in one place. Meeting Schedule M remains the manufacturer’s responsibility.

Is our data kept separate from other companies?

Yes. Each company has its own database, not rows in a shared table. Your data can be backed up, restored or exported without touching anyone else’s.

All questions

Early access is open

See it on your own process

A 30-minute walkthrough with the people building Pharma-ETA, on the workflows you run today. No slides.