Compliance
Compliance, explained control by control
What 21 CFR Part 11, EU GMP Annex 11, the revised Schedule M and ALCOA+ ask of a computerised system, and how Pharma-ETA answers each, in plain language.
What we will and will not claim
No software is “Part 11 compliant” or “Schedule M compliant” by itself. Compliance comes from how a regulated company validates, configures and uses a system, under its own procedures. What Pharma-ETA provides is the set of technical controls these regulations expect, built in and always on, so that the compliant way of working is also the easy one.
US FDA
21 CFR Part 11: electronic records and signatures
Part 11 sets the conditions under which the FDA treats electronic records and signatures as equivalent to paper and handwritten ones.
| Section | Asks for | In Pharma-ETA |
|---|---|---|
| 11.10(a) | Validation | A description of each control and its behaviour, to support your computerised system validation. |
| 11.10(d) | Limiting access | Named user accounts and role-based permissions for every screen and every act. |
| 11.10(e) | Audit trail | Computer-generated and time-stamped: who changed what, from what, to what, when and why. The earlier value is kept. |
| 11.10(f) | Operational checks | Steps enforced in order: a serial cannot ship before it is commissioned, and a stability pull waits until a chamber excursion is assessed. |
| 11.10(g) | Authority checks | Each act checks the person’s permission and, where needed, their training, at the moment they act. |
| 11.10(i) | Trained people | Training records and qualifications, with untrained people stopped at the gated step. |
| 11.50 | Signature manifestation | Printed name, date and time, and the meaning of the signature (for example “Approved for release”), shown with the record and on prints. |
| 11.70 | Signature linking | Each signature is bound to the version of the record it signs and cannot be copied to another. |
| 11.100 | Uniqueness | One person, one account. Signing PINs are set only by their owner, so an administrator cannot sign as someone else. |
| 11.200 | Signature components | Two components at every signature: the password and a separate signing PIN. |
| 11.300 | Passwords and codes | Password expiry and change, account lock-out after failed attempts, and two-factor sign-in. |
EU GMP
EU GMP Annex 11: computerised systems
Annex 11 applies to computerised systems used in GMP activities, and is followed by many inspectorates beyond Europe through PIC/S.
| Clause | Topic | In Pharma-ETA |
|---|---|---|
| 6 | Accuracy checks | Results judged against the released specification by the system. A typed instrument value needs a reason and is reported. |
| 8 | Printouts | Controlled prints with page x of y, from approved, versioned print formats. |
| 9 | Audit trails | Always on, with a reason for every change, and hash-chained so that alteration is detectable. |
| 12 | Security | Role-based access, two-factor sign-in and a database per company. |
| 14 | Electronic signature | Same weight as a handwritten signature in your procedures: permanently linked to the record, with time and date. |
| 15 | Batch release | Release is a signed act, limited by permission to the people your procedures authorise, with the results and open quality events in front of them. |
| 17 | Archiving | Retention rules, legal holds and archives, with records kept readable for their retention period. |
India
Revised Schedule M: where each topic lives
The revised Schedule M to the Drugs Rules, 1945, notified in December 2023, brings Indian GMP closer to WHO and PIC/S expectations. These are the topics it adds or strengthens, and the module that keeps each record.
Pharmaceutical quality system
Deviations, CAPA, change control, management review and quality objectives, connected.
Quality risk management
Risk assessments that are re-scored when a failure mode is unacceptable.
Product quality review
The annual review built from the batch records; its preparer cannot approve it.
Supplier qualification
Documents, three-batch testing and audit before a vendor reaches the Approved Vendor List.
Equipment, calibration and validation
Equipment register, calibration that gates results, preventive maintenance and cleaning validation.
Complaints and recalls
Investigated to a conclusion; recalls with an effectiveness check.
Training
Training matrix, assessments and qualifications that gate GMP tasks.
Documentation
SOPs and records by version, periodic review and controlled issue.
Computerised systems
Audit trail, access control and electronic signatures as described above.
Data integrity
ALCOA+, letter by letter
The principles data integrity guidance from the MHRA, WHO and PIC/S is built on. Read the plain-language guide.
Validation
Supporting your computerised system validation
Your validation is yours: risk-based, under your procedures, in the GAMP 5 approach most plants follow. We support it by describing each control and how it behaves, answering your validation team’s questions, and taking part in your supplier assessment of us.
- A description of each GMP-relevant control: signatures, audit trail, access, training gates, four-eyes rules and printing.
- The refusals each module enforces, with the reason a person sees, so your test scripts can check them.
- A direct line to the people who built the controls, during early access.
References: 21 CFR Part 11 (US FDA); EudraLex Volume 4, Annex 11; Schedule M to the Drugs Rules, 1945, as revised; MHRA GXP Data Integrity Guidance (2018); WHO TRS 1033, Annex 4 (2021); PIC/S PI 041-1 (2021).
Early access is open
Walk through the controls with us
Bring your QA head and your validation lead. We will show each control on screen and answer the questions an inspector would ask.