Early access is open for pharmaceutical plants.Book a walkthrough

Compliance

Compliance, explained control by control

What 21 CFR Part 11, EU GMP Annex 11, the revised Schedule M and ALCOA+ ask of a computerised system, and how Pharma-ETA answers each, in plain language.

What we will and will not claim

No software is “Part 11 compliant” or “Schedule M compliant” by itself. Compliance comes from how a regulated company validates, configures and uses a system, under its own procedures. What Pharma-ETA provides is the set of technical controls these regulations expect, built in and always on, so that the compliant way of working is also the easy one.

US FDA

21 CFR Part 11: electronic records and signatures

Part 11 sets the conditions under which the FDA treats electronic records and signatures as equivalent to paper and handwritten ones.

SectionAsks forIn Pharma-ETA
11.10(a)ValidationA description of each control and its behaviour, to support your computerised system validation.
11.10(d)Limiting accessNamed user accounts and role-based permissions for every screen and every act.
11.10(e)Audit trailComputer-generated and time-stamped: who changed what, from what, to what, when and why. The earlier value is kept.
11.10(f)Operational checksSteps enforced in order: a serial cannot ship before it is commissioned, and a stability pull waits until a chamber excursion is assessed.
11.10(g)Authority checksEach act checks the person’s permission and, where needed, their training, at the moment they act.
11.10(i)Trained peopleTraining records and qualifications, with untrained people stopped at the gated step.
11.50Signature manifestationPrinted name, date and time, and the meaning of the signature (for example “Approved for release”), shown with the record and on prints.
11.70Signature linkingEach signature is bound to the version of the record it signs and cannot be copied to another.
11.100UniquenessOne person, one account. Signing PINs are set only by their owner, so an administrator cannot sign as someone else.
11.200Signature componentsTwo components at every signature: the password and a separate signing PIN.
11.300Passwords and codesPassword expiry and change, account lock-out after failed attempts, and two-factor sign-in.

EU GMP

EU GMP Annex 11: computerised systems

Annex 11 applies to computerised systems used in GMP activities, and is followed by many inspectorates beyond Europe through PIC/S.

ClauseTopicIn Pharma-ETA
6Accuracy checksResults judged against the released specification by the system. A typed instrument value needs a reason and is reported.
8PrintoutsControlled prints with page x of y, from approved, versioned print formats.
9Audit trailsAlways on, with a reason for every change, and hash-chained so that alteration is detectable.
12SecurityRole-based access, two-factor sign-in and a database per company.
14Electronic signatureSame weight as a handwritten signature in your procedures: permanently linked to the record, with time and date.
15Batch releaseRelease is a signed act, limited by permission to the people your procedures authorise, with the results and open quality events in front of them.
17ArchivingRetention rules, legal holds and archives, with records kept readable for their retention period.

India

Revised Schedule M: where each topic lives

The revised Schedule M to the Drugs Rules, 1945, notified in December 2023, brings Indian GMP closer to WHO and PIC/S expectations. These are the topics it adds or strengthens, and the module that keeps each record.

Pharmaceutical quality system

Deviations, CAPA, change control, management review and quality objectives, connected.

Quality management (QMS)

Quality risk management

Risk assessments that are re-scored when a failure mode is unacceptable.

Quality management (QMS)

Product quality review

The annual review built from the batch records; its preparer cannot approve it.

Quality management (QMS)

Supplier qualification

Documents, three-batch testing and audit before a vendor reaches the Approved Vendor List.

Procurement and vendor qualification

Stability

Protocols, pulls, excursions and shelf life backed by data.

QC laboratory (LIMS)

Equipment, calibration and validation

Equipment register, calibration that gates results, preventive maintenance and cleaning validation.

Engineering and maintenance

Complaints and recalls

Investigated to a conclusion; recalls with an effectiveness check.

Quality management (QMS)

Self-inspection

Internal audit programmes and observations to closure.

Quality management (QMS)

Training

Training matrix, assessments and qualifications that gate GMP tasks.

Training, qualification and HR

Documentation

SOPs and records by version, periodic review and controlled issue.

Document control and SOPs

Computerised systems

Audit trail, access control and electronic signatures as described above.

Data integrity

ALCOA+, letter by letter

The principles data integrity guidance from the MHRA, WHO and PIC/S is built on. Read the plain-language guide.

AttributableEvery entry carries the person who made it, from their own account.
LegibleRecords are readable on screen and on controlled prints, in English or Hindi.
ContemporaneousSteps are recorded as they are done, with the system’s time, not a time typed later.
OriginalInstrument data is kept whole and hashed; a correction supersedes, it never overwrites.
AccurateVerdicts come from the specification; manual entries need a reason and are reported.
CompleteNothing is deleted. Superseded values stay in the record and the audit trail.
ConsistentOne record shared by every department, so the same fact is never typed twice.
EnduringRetention rules and archives keep records for as long as they must be kept.
AvailableRecords can be found and printed when an inspector asks, not after a search party.

Validation

Supporting your computerised system validation

Your validation is yours: risk-based, under your procedures, in the GAMP 5 approach most plants follow. We support it by describing each control and how it behaves, answering your validation team’s questions, and taking part in your supplier assessment of us.

  • A description of each GMP-relevant control: signatures, audit trail, access, training gates, four-eyes rules and printing.
  • The refusals each module enforces, with the reason a person sees, so your test scripts can check them.
  • A direct line to the people who built the controls, during early access.

References: 21 CFR Part 11 (US FDA); EudraLex Volume 4, Annex 11; Schedule M to the Drugs Rules, 1945, as revised; MHRA GXP Data Integrity Guidance (2018); WHO TRS 1033, Annex 4 (2021); PIC/S PI 041-1 (2021).

Early access is open

Walk through the controls with us

Bring your QA head and your validation lead. We will show each control on screen and answer the questions an inspector would ask.