Quality · Quality management (QMS)
A quality system that enforces its own rules
Deviations, investigations, CAPA, change control, complaints, recalls, audits, risk and the annual product review, in the same system as the batches, materials and people they are about. Nothing is copied between a QMS and an ERP, because there is only one.
What it covers
Quality management (QMS) in Pharma-ETA
Deviations and investigations
Raise a deviation or incident, assess its impact, run the root-cause investigation and close it with signatures. Repeat events are recognised as repeats.
CAPA
Corrective and preventive actions with owners, due dates and an effectiveness check before closure.
Change control
Screening, impact owners, a change board, actions, temporary changes and an effectiveness review, from request to closure.
Complaints and recalls
Market complaints investigated to a conclusion. Recalls classified from the hazard, the consignees frozen at initiation, and the trace timed for the mock-recall report.
Audits, inspections and agreements
Internal audit programmes, regulatory inspection records, observations and quality agreements with suppliers and contract givers.
Risk, metrics and management review
Quality risk assessments that are re-scored rather than waved through, quality objectives, metrics and trend boards, and the management review that reads them.
Annual product quality review
The review period and its batches are computed from the batch records, not typed in. The person who prepares it cannot approve it.
Batch disposition
The QA desk sees every batch waiting for a decision, with its results, deviations and open actions on one screen.
Rules it enforces
What the system will not let anyone do
Each of these is refused at the moment it is attempted, with the reason shown in plain words to the person who tried.
- The person who assessed a change’s impact approving that change.
- A CAPA closing while one of its actions is still open.
- A third identical deviation being closed as an isolated incident.
- A root cause accepted on a step nobody recorded evidence for.
- Closing a complaint whose investigation is unfinished.
- Closing a recall with no effectiveness check, or the person who started it signing that check.
- The preparer of an annual product review approving it as well.
More screens

Built in, as everywhere
The controls every module shares
Common questions
Is the QMS a separate product?
No. Deviations, CAPA and change control are part of the same system as production, the laboratory and the warehouse, so a deviation is raised against the real batch and a change control can name the real documents, equipment and materials it affects.
Can a deviation hold a batch?
Yes. Open quality events are visible at batch disposition, and the QA desk sees them before a release decision is signed.
Works with
Document control and SOPs
SOPs and controlled documents from draft to effective, periodic review, issued formats and controlled printing.
QC laboratory (LIMS)
Samples, specifications, results, OOS and OOT, certificates of analysis, instruments and stability studies.
Batch manufacturing (eBMR)
Master batch records, batch issue, dispensing, line clearance, in-process checks and release.
Early access is open
See it on your own process
A 30-minute walkthrough with the people building Pharma-ETA, on the workflows you run today. No slides.