Early access is open for pharmaceutical plants.Book a walkthrough

Plan and make ยท Engineering and maintenance

Every machine, its maintenance and the batches it made

Machines, chambers and instruments are registered once. Preventive maintenance and calibration come due on schedule, breakdowns become work orders, and the batches made on a machine are one click away when something goes wrong.

What it covers

Engineering and maintenance in Pharma-ETA

Equipment register

Machines, utilities, chambers and instruments with their location, status and history.

Preventive maintenance

Maintenance plans and schedules, with the work recorded against the equipment.

Breakdowns and work orders

Breakdowns reported from the floor, turned into work orders and closed with what was done.

Calibration

Calibration schedules and results. An instrument out of calibration cannot be used for a result.

Capital expenditure

Capex requests and their approval.

Built in, as everywhere

The controls every module shares

SignaturesMeaning, reason, password and signing PIN, locked to the record version.
Audit trailWho, what, when and why for every change. Always on.
Four-eyesNobody approves their own work, checked when they try.
TrainingGMP acts need a current qualification.

Common questions

Are machines connected?

Equipment and chamber readings can be collected over Modbus TCP and from file exports, and balances over a serial connection. Each interface is qualified separately from the machine it connects.

Early access is open

See it on your own process

A 30-minute walkthrough with the people building Pharma-ETA, on the workflows you run today. No slides.