Early access is open for pharmaceutical plants.Book a walkthrough

Plan and make ยท Planning, MRP and scheduling

A plan the plant can actually run

Material requirements are worked out from demand, stock and the approved formula. Capacity is planned by work centre, sequenced with campaigns to reduce changeovers, and published as a signed schedule the floor works to.

What it covers

Planning, MRP and scheduling in Pharma-ETA

Requirements (MRP)

What to buy and what to make, from demand, stock, open orders and the approved bill of materials.

Planned orders and exceptions

Proposals to approve, and exceptions that need a planner: shortages, late supply, expiring stock.

Scenarios

Plan alternatives side by side before committing to one.

Capacity

Load by work centre and calendar, so an overloaded week is visible before it happens.

Sequencing and campaigns

Finite-capacity sequencing that groups products into campaigns to cut cleaning and changeover time.

Published schedule and follow-up

A schedule published with a signature, and follow-up on orders that slip.

Rules it enforces

What the system will not let anyone do

Each of these is refused at the moment it is attempted, with the reason shown in plain words to the person who tried.

  • Publishing a schedule over a horizon that already has a published schedule.

Built in, as everywhere

The controls every module shares

SignaturesMeaning, reason, password and signing PIN, locked to the record version.
Audit trailWho, what, when and why for every change. Always on.
Four-eyesNobody approves their own work, checked when they try.
TrainingGMP acts need a current qualification.

Common questions

Does planning use approved formulas only?

Yes. Requirements come from the approved version of the bill of materials, the same one production issues batches from.

Early access is open

See it on your own process

A 30-minute walkthrough with the people building Pharma-ETA, on the workflows you run today. No slides.