Plan and make ยท Planning, MRP and scheduling
A plan the plant can actually run
Material requirements are worked out from demand, stock and the approved formula. Capacity is planned by work centre, sequenced with campaigns to reduce changeovers, and published as a signed schedule the floor works to.
What it covers
Planning, MRP and scheduling in Pharma-ETA
Requirements (MRP)
What to buy and what to make, from demand, stock, open orders and the approved bill of materials.
Planned orders and exceptions
Proposals to approve, and exceptions that need a planner: shortages, late supply, expiring stock.
Scenarios
Plan alternatives side by side before committing to one.
Capacity
Load by work centre and calendar, so an overloaded week is visible before it happens.
Sequencing and campaigns
Finite-capacity sequencing that groups products into campaigns to cut cleaning and changeover time.
Published schedule and follow-up
A schedule published with a signature, and follow-up on orders that slip.
Rules it enforces
What the system will not let anyone do
Each of these is refused at the moment it is attempted, with the reason shown in plain words to the person who tried.
- Publishing a schedule over a horizon that already has a published schedule.
Built in, as everywhere
The controls every module shares
Common questions
Does planning use approved formulas only?
Yes. Requirements come from the approved version of the bill of materials, the same one production issues batches from.
Works with
Batch manufacturing (eBMR)
Master batch records, batch issue, dispensing, line clearance, in-process checks and release.
Procurement and vendor qualification
Requisitions to purchase orders, and vendor qualification from provisional ID to the Approved Vendor List.
Warehouse and inventory
Goods receipt, quarantine and release, bins, dispensing, retests, controlled substances and dispatch.
Early access is open
See it on your own process
A 30-minute walkthrough with the people building Pharma-ETA, on the workflows you run today. No slides.