A batch can only be as good as what goes into it. That is why GMP asks manufacturers to buy starting and packaging materials only from suppliers their quality unit has approved, and to keep that approval current. This guide walks through a practical qualification flow, from the first contact with a new supplier to its place on the Approved Vendor List (AVL).

What the guidelines expect

ICH Q7, the GMP guide for active pharmaceutical ingredients, expects materials to be bought against an agreed specification from suppliers approved by the quality unit, and expects a system for evaluating suppliers of critical materials. EU GMP Part I, Chapter 5, asks for the selection, qualification, approval and maintenance of suppliers of starting materials to be documented as part of the quality system. The revised Schedule M brings the same expectation into Indian GMP. None of them prescribes one exact procedure; each expects a documented, risk-based one that you follow.

A practical flow, step by step

1. Register the supplier as provisional

Purchase records the new supplier with what is known: name, the manufacturing site, the materials it would supply. Give it a provisional identifier so that nothing can be bought from it as if it were approved. Record whether it is the manufacturer or a trader, and if a trader, which manufacturer and site actually make the material.

2. Request documents and samples

Ask for the documents your procedure needs, typically a completed supplier questionnaire, manufacturing licence and GMP certificate, the material specification and certificates of analysis, and, depending on the material, statements such as TSE/BSE, residual solvents or nitrosamine risk assessments. Ask for samples at the same time; one request is faster than three.

3. Verify and approve the documents

QA checks each document for completeness and validity (expiry dates, the right site, the right material), and the approval is signed by someone with the authority to give it.

4. Test the samples

QC tests the samples against your full specification. Many companies test three batches before approval to see consistency, not just one good lot. Results that are out of specification are investigated like any other OOS.

5. Classify the material by risk

How critical is this material to the product? An API or a primary packaging component needs more scrutiny than a secondary carton. The classification decides how deep the audit goes and how often the supplier is re-evaluated.

6. Audit the supplier

Depending on the risk, an on-site audit, a remote audit or a questionnaire-based assessment. Observations get responses and, where needed, corrective actions. Have the audit report reviewed and signed off by someone other than the auditor.

7. Approve and list

Once every step is complete, the supplier is approved for that material from that site and added to the Approved Vendor List. Approval belongs to the combination of material, manufacturer and site, not to a company name.

Keeping the approval current

  • Monitor performance: rejections, OOS results, deviations and delivery against what was promised.
  • Re-evaluate periodically, with re-audits at a frequency set by risk.
  • Agree change notification in a quality agreement, so that a change of site, process or source reaches you before the material does.
  • Act on expiry: a lapsed GMP certificate or licence should be visible before the next order, not at the next audit.

What inspectors commonly find

  • Material bought from a supplier that was not yet, or no longer, approved.
  • An AVL that lists company names, not the material and manufacturing site approved.
  • Traders approved without knowing, or auditing, the actual manufacturer.
  • Approvals that were never re-evaluated after the first audit.
  • Audits signed off by the person who performed them.

How Pharma-ETA runs it

Pharma-ETA follows this flow as a sequence of signed steps, each by the role that owns it: Purchase registers the vendor with a provisional vendor ID, documents and samples are requested in one email, QA verifies and the Head of QA approves the documents, QC tests three batches to the full specification, QA approves the samples and classifies the material, and the facility audit is signed off by someone other than the auditor. Only then does the vendor reach the Approved Vendor List with an approved vendor ID. See procurement and vendor qualification.

This article summarises the regulations for general information. It is not legal or regulatory advice; rely on the published texts and your own procedures.

Early access is open

See it on your own process

A 30-minute walkthrough with the people building Pharma-ETA, on the workflows you run today. No slides.